by The Laberge Group | May 13, 2015 | Engineering, Wastewater
Laberge Group ultimately determined that while it was not cost effective to treat all of the Town’s wastewater at a new Town-owned facility, a new plant could economically treat a large portion of the current and future sewer service areas. During the negotiation...
by The Laberge Group | May 13, 2015 | Engineering, Water
Prior to the improvements, the Village had been utilizing untreated water from the Village of Herkimer’s raw water viaduct. Regulatory requirements of the Surface Water Treatment Rule required that the water be filtered or that a new source be found. In addition, a...
by The Laberge Group | Apr 15, 2015 | Engineering, Recreational
Floating Dock Facility Laberge Group was responsible for the design of a public floating dock facility to function as an occasional mooring for the sailing vessels Hudson River Sloop Clearwater and the Halfmoon, located at the existing River Front Park site in...
Recent Comments